Enel X Umberto I Nord-Estcharging location
Sul palo della luce!
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]La colonnina integrata nel palo della luce: speriamo che possa avere un grande seguito. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-pescara-pe-corso-umberto-i-129-t12068.html
https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-pescara-pe-corso-umberto-i-129-t12068.html Comment by ForumElettrico.it 08/16/2020 17:08:34
Other Charging Locations
There are 9 matching results
Enel X Umberto I Sud-Ovest
1
2
Public
Operational
Best Western Hotel Plaza
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Enel X Tigre
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Conad del Circuito
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Pescara Diaz | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Pescara Porta Nuova | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LIDL Pescara
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Pescara Ciglia | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX Parcheggio Aterno-Manthonè
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-08-16
Uploaded by ForumElettrico.it on 2020-08-16
Uploaded by ForumElettrico.it on 2020-08-16
Uploaded by ForumElettrico.it on 2020-08-16
Uploaded by ForumElettrico.it on 2020-08-16
Uploaded by ForumElettrico.it on 2020-08-16