Circle K Service Stationcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
ESB Ecars http://www.esb.ie/electric-cars/index.jsp 1890 372 387
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
Type 2 (Socket Only)
CCS (Type 2)
Add your own comment/check-in for this location:
Sign InRating: 4 out of 5 [ Important Notice (For Other Users) , Other (Positive/Good) ]This unit also has CCS 50kW
Comment by ARGault 09/04/2022 20:50:08
Rating: 4 out of 5 [ General Comment , Charged Successfully ]Can't say as to the dc rapid side of this unit,but the 22kw ac side I've found to be hit and miss...sometimes I get a charge,sometimes not..last rime,I did.
Comment by gallagher.ger 01/04/2015 06:12:37
[ General Comment , Failed to Charge (Equipment Problem) ]Failure to charge error displayed on unit screen after handshake and charge start
Comment by gallagher.ger 12/31/2014 23:05:05
Other Charging Locations
There are 9 matching results
College of Agriculture Food and Rural Enterprise (CAFRE)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lough Erne Resort
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ambulance Station Car Park
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Head Street Car Park
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enniskillen Business Centre
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enniskilleen Hotel
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cross Street Car Park
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eden Street
Operational
Eden Street Car Park
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Rc9 22kw ac/50kw chademo
Uploaded by gallagher.ger on 2014-12-31