Duferco Casa della Salutecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Duferco Energie https://mobility.dufercoenergia.com/ +39 345 7051126
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok con card Enel X sulla presa di destra. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post262799.html#p262799
https://www.forumelettrico.it/forum/post262799.html#p262799 Comment by ForumElettrico.it 12/14/2021 08:57:16
[ General Comment , Charged Successfully ]Il parcheggio della struttura è accessibile in h24. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-duferco-2x22kw-casa-della-salute-g-p-vecchi-via-rita-levi-montalcini-200-modena-t12835.html
https://www.forumelettrico.it/forum/colonnina-duferco-2x22kw-casa-della-salute-g-p-vecchi-via-rita-levi-montalcini-200-modena-t12835.html Comment by ForumElettrico.it 09/26/2020 08:42:01
Other Charging Locations
There are 9 matching results
Hera Porta Nord
2
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Esselunga
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera PalaMadiba
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Stazione di Modena
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Parco Vittime innocenti di Utoya
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Best Western Premier Milano Palace Hotel
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
EnerMia
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-12-14
Uploaded by ForumElettrico.it on 2020-09-26
Uploaded by ForumElettrico.it on 2020-09-26
Uploaded by ForumElettrico.it on 2020-09-26
Uploaded by ForumElettrico.it on 2020-09-26