BECHARGE Orte charging location

Nearest Address:
Strada Statale 675 Umbro-Laziale
Orte
VT
01028
Italy

02-49527730
This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 2
Usage: Public - Membership Required
Operational Status: Operational
Latitude: 42.46316121521832
Longitude: 12.422365269884608
OCM Ref: OCM-168470
Network/Operator

Be Charge (Italy) https://www.bec.energy/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

CCS (Type 2)

Operational
1 Present
OCM-CN-255855
75 kW DC

CHAdeMO

Operational
1 Present
OCM-CN-255856
50 kW DC

Type 2 (Socket Only)

Operational
1 Present
OCM-CN-255857
22 kW AC (Three-Phase)
400 V
32 A

Add your own comment/check-in for this location:

Sign In
[ General Comment , Charged Successfully ]

Presente area di servizio e hotel ristorante. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-be-charge-fast-75kw-orte-via-terni-42-t13009.html

https://www.forumelettrico.it/forum/colonnina-be-charge-fast-75kw-orte-via-terni-42-t13009.html Comment by ForumElettrico.it 10/02/2020 07:02:33

Other Charging Locations

There are 9 matching results

EnelX EVA+ Orte
5   10

Via Lazio
Orte
VT
01028
Italy
View
0.97 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Ewiva Orte
1   5

Via Amerina 271
Orte
VT
Italy
View
1.42 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Orte Impianti Sportivi | EnelX
 

Via del Campo Sportivo
Orte
VT
01028
Italy
View
1.79 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Orte Parcheggio Molegnano | EnelX
 

Parcheggio Molegnano
Orte Scalo
Orte
VT
01028
Italy
View
1.81 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Orte Matteotti | EnelX
1   5

Via G. Matteotti
Orte
VT
01028
Italy
View
1.89 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Ewiva Bassono in Teverina
1   1

SS 675 km 40
Bassano in Teverina
VT
Italy
View
5.97 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Eneldrive Centro Storico
 

Via Suffragio
Narni
TR
05035
Italy
View
6.18 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Free to X Giove Ovest
2   11

Autostrada del Sole
Umbria
05012
Italy
View
6.2 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Be Charge
2   7

Via Roma 84
Narni
TR
Italy
View
6.23 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In

Uploaded by ForumElettrico.it on 2020-10-02

Uploaded by ForumElettrico.it on 2020-10-02

Uploaded by ForumElettrico.it on 2020-10-02

Uploaded by ForumElettrico.it on 2020-10-02