To edit, add comments or upload photos: Sign In
Hotel Alpenland ***S, charging location
Nearest Address:
Stuls 7B
Moos in Passeier
Bozen
39013
Italy
+39 0473 649 544
General Information:
Die Ladestation befindet sich auf dem Kundenparkplatz
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Public - Membership Required
Usage Cost:
Consumption-based by kWh
Operational Status:
Operational
Latitude:
46.828088447064346
Longitude:
11.19555999905981
OCM Ref: OCM-168776
Access Information:
Für Hotelkunden mittels RFID Karte Ecogy 11 kW
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-256526
11 kW
AC (Three-Phase)
400 V
16 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Hotel Alpenland ***S,
0 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Moso in Passiria Stuls | E.U.M.gen.
0.22 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Moso in Passiria Plata | E.U.M.gen.
0.99 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
HPC Moso in Passiria | EUM by Evway
1
3
1.33 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Moso in Passiria Dorf | E.U.M.gen.
1
1.34 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Moso in Passiria
1.44 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Ladestation Camping Zögghof
2.23 Miles
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
San Leonardo in Passiria Busbahnhof | Neogy
1
2
2.65 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Residence Mairhof ***S
2
2.67 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)