Enel X Fast Sede Enelcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign InRating: 3 out of 5 [ General Comment , Charged Successfully ] Comment by Carlomanda 11/21/2021 20:07:41
[ General Comment , Charged Successfully ]Una delle due pole (quella con la presa 3A) è stata sostituita da una FAST. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-enel-x-fast-sede-enel-alessandria-al-via-san-giovanni-bosco-10-g-t14036.html
https://www.forumelettrico.it/forum/colonnina-enel-x-fast-sede-enel-alessandria-al-via-san-giovanni-bosco-10-g-t14036.html Comment by ForumElettrico.it 11/17/2020 18:36:17
Other Charging Locations
There are 9 matching results
Alessandria Via San Giovanni Bosco | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eni
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Alessandria Retail Park Ovest | Driwe
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PENNY Market Alessandria | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Alessandria Retail Park Est | Driwe
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A MD Quartiere Pista
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Alessandria Libertà | Emobitaly
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Modena 54
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Alessandria Repubblica | Emobitaly
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-11-17
Uploaded by ForumElettrico.it on 2020-11-17
Uploaded by ForumElettrico.it on 2020-11-17
Uploaded by ForumElettrico.it on 2020-11-17