Polígono industrial La Vegacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
ACCIONA - Cargacoches https://recarga.acciona.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Circutor Raption50 Charger
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign InRating: 5 out of 5 [ Important Notice (For Other Users) , Other (Positive/Good) ]Este punto no se encuentra disponible. En breves, les daremos noticias. Lamentamos las molestias.
Comment by ACCIONA RECARGA 12/09/2020 09:05:26
Other Charging Locations
There are 9 matching results
Iberdrola Reinosa
2
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Reinosa. Calle Casimiro Sainz
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Celliscas Auto Centro
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Chisco Motor (Bosch Car Service)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Ayunt. Reinosa. Calle de los Peligros
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Reinosa. Calle Ebro
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Reinosa. Calle de las Fuentes
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Campo de Golf de Nestares
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Vejo
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ACCIONA RECARGA on 2020-12-09