Gridserve Electric Forecourt - Braintreecharging location

Nearest Address:
Edison Way
Great Notley
Braintree
Essex
CM77 7AP
United Kingdom

08002404242
This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 34
Usage: Public - Pay At Location
Usage Cost: DC (contactless): £0.85/kWh, DC (GRIDSERVE app): £0.79/kWh, AC: £0.49/kWh
Operational Status: Operational
Latitude: 51.8524064
Longitude: 0.52128118
OCM Ref: OCM-170622
Network/Operator

GridServe https://www.gridserve.com/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

CCS (Type 2)

Operational
1 Present
OCM-CN-260500
350 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433001
360 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433003
350 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433004
350 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433005
350 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433007
350 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433008
360 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433009
350 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433013
350 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433016
350 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433017
90 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433018
350 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433019
350 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-433021
350 kW DC

Type 2 (Socket Only)

Operational
1 Present
OCM-CN-434572
22 kW AC (Three-Phase)
400 V
32 A

Type 2 (Socket Only)

Operational
1 Present
OCM-CN-434573
22 kW AC (Three-Phase)
400 V
32 A

Type 2 (Socket Only)

Operational
1 Present
OCM-CN-434574
22 kW AC (Three-Phase)
400 V
32 A

Type 2 (Socket Only)

Operational
1 Present
OCM-CN-434575
22 kW AC (Three-Phase)
400 V
32 A

Type 2 (Socket Only)

Operational
1 Present
OCM-CN-434576
22 kW AC (Three-Phase)
400 V
32 A

Type 2 (Socket Only)

Operational
1 Present
OCM-CN-434577
22 kW AC (Three-Phase)
400 V
32 A

CCS (Type 2)

Operational
1 Present
OCM-CN-591787
90 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-593334
90 kW DC

CHAdeMO

Operational
1 Present
OCM-CN-593870
90 kW DC

CHAdeMO

Operational
1 Present
OCM-CN-593872
90 kW DC

CHAdeMO

Operational
1 Present
OCM-CN-593876
90 kW DC

CHAdeMO

Operational
1 Present
OCM-CN-593879
90 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-594353
90 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-594354
90 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-594355
90 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-594356
90 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-594357
350 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-594358
90 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-594359
90 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-594360
90 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-594361
90 kW DC

CCS (Type 2)

Operational
1 Present
OCM-CN-594362
90 kW DC

Add your own comment/check-in for this location:

Sign In
Rating: 5 out of 5 [ General Comment , Charged Successfully ]

Friendly staff, well laid out forecourt, interesting linked facilities such as the meeting pods etc.

Comment by RonnieLast 04/13/2024 08:37:09
Rating: 5 out of 5 [ Important Notice (For Other Users) , Charged Successfully ]

24/7 Charging - Coffee & Retail for take away and last minute grocerys availble - 7 days a week Hours approx 0700h-2000h

Comment by gridserve_braintree 02/05/2021 15:18:21

Other Charging Locations

There are 9 matching results

Braintree Supercharger
 

Blackley Lane
Braintree
CM77 7QW
United Kingdom
View
0.05 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger

Tesco Superstore - Braintree Great Notley
 

1 The Square
Braintree
CM77 7WW
United Kingdom
View
0.36 Miles
Public
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

George Yard Car Park
 

Pierrefitte Way
Braintree
CM7 1RB
United Kingdom
View
2.15 Miles
Public - Membership Required

Level 3: High (Over 40kW)
CHAdeMO

Tesco Superstore-Braintree Town Centre
 

Market Place
Braintree
CM7 3HQ
United Kingdom
View
2.17 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Econoprint (UK) LTD
 

Cooper Drive
Essex
CM7 2RF
United Kingdom
View
2.41 Miles
Private - For Staff, Visitors or Customers
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Braintree District Council - Causeway House
1  

Causeway House
Braintree
Essex
CM7 9HB
United Kingdom
View
2.45 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

John Pease Peugeot Braintree
 

Manor Street
Braintree
Essex
CM7 3BH
United Kingdom
View
2.48 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Bannatyne Health Club - Braintree
 

Springwood Drive
Braintree
Essex
CM7 2YN
United Kingdom
View
2.62 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CHAdeMO

McDonald's Braintree
 

Galleys Corner
Norfolk
England
CM77 8EZ
United Kingdom
View
2.77 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Upload your own photos for this location: Sign In

An interesting view of the future of charging, done well in this instance.

Uploaded by RonnieLast on 2024-04-13

36 chargers on site

Uploaded by gridserve_braintree on 2021-02-05

24 hour Charging #GRIDSERVE, #electricvehicles

Uploaded by gridserve_braintree on 2021-02-05

The future is here ! - #GRIDSERVE, #deliver, #electricvehicles,#sustainableenergy

Uploaded by gridserve_braintree on 2021-02-05

Uploaded by Redders on 2021-01-15