Pieve ti Ricarica charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Stazione interessante ed innovativa, situata in un paese molto tipico che merita di essere visitato. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post210864.html#p210864
https://www.forumelettrico.it/forum/post210864.html#p210864 Comment by ForumElettrico.it 06/05/2021 09:48:27
Rating: 5 out of 5 [ General Comment , Charged Successfully ] Comment by MauroneRelax 05/17/2021 20:03:32
[ General Comment , Charged Successfully ]150 kW di fornitura e la colonnina DC dovrebbe arrivare a 100 kW per un singolo EV. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/pieve-di-cento-bo-due-fast-e-5-ac-operative-da-oggi-150kw-t15123.html
https://www.forumelettrico.it/forum/pieve-di-cento-bo-due-fast-e-5-ac-operative-da-oggi-150kw-t15123.html Comment by ForumElettrico.it 01/19/2021 08:27:17
Other Charging Locations
There are 9 matching results
Volkswagen F.G.Z. Service
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plenitude Castello D'argile
1
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
C.M.V. Servizi Srl
2
6
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
San Matteo Poste | EnelX
3
10
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Centro Sportivo
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Scuola Secondaria di Primo Grado Bagnoli
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Coop
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Municipio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
San Giorgio di Piano Stalingrado | EnelX
1
4
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-06-05
Uploaded by ForumElettrico.it on 2021-06-05
Uploaded by ForumElettrico.it on 2021-06-05
Uploaded by ForumElettrico.it on 2021-06-05
Uploaded by ForumElettrico.it on 2021-06-05
Uploaded by ForumElettrico.it on 2021-01-19
Uploaded by ForumElettrico.it on 2021-01-19
Uploaded by ForumElettrico.it on 2021-01-19
Uploaded by ForumElettrico.it on 2021-01-19