To edit, add comments or upload photos: Sign In
דור אלון בית השיטהcharging location
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
AC: 5 + 1.2 / kWh, DC: 2/ kWh
Operational Status:
Operational
Latitude:
32.54460969971426
Longitude:
35.43431208462562
OCM Ref: OCM-172762
Network/Operator
Afcon (IL) https://www.afconev.co.il/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-264224
22 kW
AC (Three-Phase)
CHAdeMO
Operational
1 Present
OCM-CN-264225
50 kW
DC
CCS (Type 2)
Operational
1 Present
OCM-CN-264226
175 kW
DC
CCS (Type 2)
Operational
1 Present
OCM-CN-272810
50 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-272811
50 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
טן בית שאן
4.49 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Zim Beyt Shean
4.57 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
מרכז מבקרים - חוות הטורבינות בגלבוע
5.27 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
2310 (פרטי)
5.95 Miles
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
שאן מפעלים אזוריים, בית שאן, Israel
6.08 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
דור-אלון יזרעאל
6.57 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
דלק גן נר
6.75 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Secretariat
8.65 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
G Baemek
1
8.77 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)