Acea charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Situata un paio di km fuori Roma dopo il GRA. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-fast-acea-via-salaria-roma-t16823.html
https://www.forumelettrico.it/forum/colonnina-fast-acea-via-salaria-roma-t16823.html Comment by ForumElettrico.it 04/07/2021 09:30:27
Other Charging Locations
There are 9 matching results
Gallo Capitale Pizza E Grill
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Nissan Autogiapponese
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CHAdeMO
Autostar Flaminia
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Saxa Rubra
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X HPC Redicicoli
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
IKEA Porta di Roma
1
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tesla Porta di Roma
1
2
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Piazza Marianna Benti Bulgarelli | EnelX
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Acea Scuola Maria Stern Nuovo
1
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-04-07
Uploaded by ForumElettrico.it on 2021-04-07
Uploaded by ForumElettrico.it on 2021-04-07
Uploaded by ForumElettrico.it on 2021-04-07
Uploaded by ForumElettrico.it on 2021-04-07
Uploaded by ForumElettrico.it on 2021-04-07