Hotel Brasería La Barcacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
TotalEnergies (ES) https://www.totalenergies.es/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Delta UFC150 Charger. Max power of the charger for both combined outlets 100 kW. (First CCS connector 100 kW, second CCS/Chademo connector 50 kW.
CHAdeMO
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
E.S. Repsol Lepe
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Avenida Consolación
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Mercadona Cartaya
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repsol Cartaya
2
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aldi Cartaya
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Carrefour Cartaya
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Lepe Centro Comercial
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Lepe
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Lepe - Mercadillo
1
Public
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)