To edit, add comments or upload photos: Sign In
Venta Santa Luciacharging location
Nearest Address:
Carretera N-II, Km. 372
Pina de Ebro
Zaragoza
50750
Spain
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
0.45€/kWh
Operational Status:
Planned For Future Date
Latitude:
41.49595733052604
Longitude:
-0.3674203953963229
OCM Ref: OCM-175365
Network/Operator
Wenea http://www.wenea.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
Operational
2 Present
OCM-CN-272037
25 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-272038
25 kW
DC
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-272039
22 kW
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 8 matching results
E.S. Cepsa Pina de Ebro (Dir. Lérida)
1
2.46 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
E.S. Pina de Ebro (Dir. Zaragoza)
2.57 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Quinto de Ebro
1
8.24 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Polideportivo Quinto
1
8.28 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Central Escatrón
13.92 Miles
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repsol Fuentes de Ebro
1
13.98 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Escatrón
1
14.29 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Escatrón. Piscinas
1
14.7 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)