Free to X AdS Flaminia Estcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Free To X https://www.freeto-x.it/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema con card EWE Go anche se le colonnine non compaiono in app, ma manca la fast con Tipo 2 e CHAdeMO ed in più c'è un alto rischio di abusivismo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post475177.html#p475177
https://www.forumelettrico.it/forum/post475177.html#p475177 Comment by ForumElettrico.it 01/12/2025 07:55:57
Rating: 5 out of 5 [ General Comment , Charged Successfully ] Comment by Carlomanda 11/21/2021 11:21:32
[ General Comment , Equipment & Location Confirmed Correct ]Sotto una pensilina, appena all'ingresso dell'AdS sui parcheggi auto che ci trovano sulla destra. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-enel-x-fast-ads-flaminia-est-magliano-sabina-ri-t12634.html
https://www.forumelettrico.it/forum/colonnina-enel-x-fast-ads-flaminia-est-magliano-sabina-ri-t12634.html Comment by ForumElettrico.it 05/18/2021 05:12:11
Other Charging Locations
There are 9 matching results
Free To X ADS Flaminia Ovest
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Foglia Piazza Castello | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ostello Magliano Sabina
1
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Crispi
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
MAGLIANO SABINA Viale XIII Giugno | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Magliano Sabina Cimitero | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Magliano Sabina Pineta comunale | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BeCharge ADS Enerpetroli Civita Castellana
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ Magliano Sabina
4
11
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-01-12
Uploaded by ForumElettrico.it on 2025-01-12
Uploaded by ForumElettrico.it on 2025-01-12
Uploaded by ForumElettrico.it on 2025-01-12
Uploaded by ForumElettrico.it on 2025-01-12
Uploaded by Carlomanda on 2021-11-21
Uploaded by ForumElettrico.it on 2021-05-18
Uploaded by ForumElettrico.it on 2021-05-18
Uploaded by ForumElettrico.it on 2021-05-18
Uploaded by ForumElettrico.it on 2021-05-18
Uploaded by ForumElettrico.it on 2021-05-18