Bei der Lohmühle 54charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Orlencharge https://orlencharge.orlen.pl/ +48502167536
Bundesnetzagentur.de https://bundesnetzagentur.de
Provided by Bundesnetzagentur.de under the CC-BY 4.0 license
9792
Data Quality Report
Data Quality Score: 60 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Unknown Usage Type
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
CCS (Type 2)
CHAdeMO
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Einkaufszentrum Hagebaumarkt
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Hotel Vier Jahreszeiten Luebeck
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Olympic Auto - Lübeck
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Tesla Supercharger Lübeck
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Musik- und Kongresshalle
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Industrie und Handelskammer
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Konrad-Adenauer-Str. 0
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Beckergrube 33
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Beckergrube
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In