Wenea Hotel el Acueductocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
TotalEnergies (ES) https://www.totalenergies.es/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Delta UFC150 Charger. Max power of the charger for both combined outlets 100 kW. (First CCS connector 100 kW, second CCS/Chademo connector 50 kW)
CHAdeMO
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ayunt. Madrigalejo (DipCa)
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
DIPBA Navalvillar de Pela
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Apartamentos Turisiticos Embalse de Orellana
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Hotel Rest. Cortijo de Santa Cruz
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Villanueva de la Serena
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mercadona Villanueva de la Serena
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Villanueva De La Serena
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parking Constitución
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Presa de La Serena
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)