Palkom Motorscharging location
Exicom Harmony 40kW 100A DCFC with CCS2 or CHAdeMO and a 22kW Type 2 AC EVSE that can be used simultaneously. Please visit the showroom to ask about brand new Tesla Model S3XY. Added into OpenCharge by @ECOmodepassion on 22/10/2021
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Easily spotted once entering the premise
chargEV https://chargev.my/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Jalan Molek 1/27
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
[Restricted] MOLEK REGENCY (TOWER B) (Residential Condo)
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
[Restricted] KSL RESIDENCES @ DAYA (Residential Condo)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
JomCharge | Lotus's Desa Terau [11kW AC]
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
chargEV | AEON Mall Tebrau City [120kW DC & 22kW AC]
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
ParkEasy @ Decathlon Toppen JB
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
JomCharge | Toppen Shopping Centre (Yellow Zone) [200kW DC | 22kW AC]
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
IKEA Tebrau
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ACO HQ Johor Bahru
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ECOmodepassion on 2021-10-22