To edit, add comments or upload photos: Sign In
Stadtwerke Heidenheim AG -Ladesäule Turn- und Festhalle Großkuchencharging location
Nearest Address:
Rathausplatz 1
Heidenheim an der Brenz
89520
Germany
General Information:
Die Stadtwerke Heidenheim AG - Unternehmensgruppe gehört zum Verbund ladenetz.de
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
AC 41,00 ct/kWh; (mit Hellensteinstrom mobil Ladekarte: AC 35,00 ct/kWh) ab der 31. Minuten 1,50 EUR je 30 Minuten
Operational Status:
Operational
Latitude:
48.75121
Longitude:
9
OCM Ref: OCM-190377
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-308615
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Rasthof Sindelfinger Wald Süd
1.67 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
VW Autohaus Steegmüller
2.21 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tesla Supercharger
1
1
2.47 Miles
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Breitwiesenstr. 4
2.48 Miles
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Schnelllader Leonberg
2.49 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
ADAC Verkehrsübungsplatz
2.5 Miles
Privately Owned - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Privately Owned - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fritzles Home
2.54 Miles
Privately Owned - Notice Required
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Privately Owned - Notice Required
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Goethestraße
2.56 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Stadtwerke
2.7 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In