To edit, add comments or upload photos: Sign In
30 Irtyshskaya Embankmentcharging location
Nearest Address:
30 Irtyshskaya Embankment
Omsk
Omsk Oblast
644000
Russian Federation
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Private - For Staff, Visitors or Customers
Usage Cost:
Free for guests staying there and ₽500 for all guests staying outside the hotel
Operational Status:
Operational
Latitude:
54.95420524222246
Longitude:
73.38004283058092
OCM Ref: OCM-190486
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-308839
22 kW
AC (Three-Phase)
400 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
ТП 5215
1.59 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
ОЭСК
1.61 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ТЦ Казачья Слобода
1.64 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Сбербанк Омск
2.09 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
ТЦ Festival City
3.01 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Октябрьская
3.29 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
АЗС Топлайн Россети
3.52 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Магнит Станционная
3.73 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Кировский округ
3.94 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In