Be Charge Cimiterocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Il parcheggio è immenso e difficile pensare che si possano trovare gli stalli abusati (ma chi lo sa poi, nelle giornate tipo il 2 novembre). Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-be-charge-piacenza-parcheggio-cimitero-via-giuseppe-portapuglia-11-t19105.html
https://www.forumelettrico.it/forum/colonnine-be-charge-piacenza-parcheggio-cimitero-via-giuseppe-portapuglia-11-t19105.html Comment by ForumElettrico.it 12/11/2021 12:15:47
Other Charging Locations
There are 9 matching results
C.B.A. Energia Fametec
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Officina F.lli Varani | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Decathlon
1
7
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aldi Piacenza
2
6
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge McDonald’s
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eneldrive Punto Enel
2
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl
1
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Conciliazione
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LEAP Piacenza
1
3
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-12-11
Uploaded by ForumElettrico.it on 2021-12-11
Uploaded by ForumElettrico.it on 2021-12-11
Uploaded by ForumElettrico.it on 2021-12-11
Uploaded by ForumElettrico.it on 2021-12-11
Uploaded by ForumElettrico.it on 2021-12-11