Be Charge Municipiocharging location

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 2
Usage: Public
Operational Status: Operational
Latitude: 44.937233
Longitude: 10.270808
OCM Ref: OCM-190772
Network/Operator

Be Charge (Italy) https://www.bec.energy/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

Type 2 (Socket Only)

Status Unknown
4 Present
OCM-CN-309384
22 kW

Add your own comment/check-in for this location:

Sign In
[ General Comment , Charged Successfully ]

Sulla strada principale troviamo subito un bar e qualche esercizio commerciale. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-municipio-di-sissa-trecasali-pr-largo-la-rinascente-t22315.html

https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-municipio-di-sissa-trecasali-pr-largo-la-rinascente-t22315.html Comment by ForumElettrico.it 12/22/2021 11:34:43

Other Charging Locations

There are 9 matching results

Be Charge Nido d'Infanzia Pinocchio
2   9

Viale della Costituzione 4
Sissa Trecasali
PR
Italy
View
1.88 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Enel X Conad
2   7

SS 10
San Secondo Parmense
PR
Italy
View
2.22 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Acea Conad
1   5

Via Pasini 1/8
Colorno
PR
Italy
View
4.93 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Acea
1   4

Via Milano 3
Colorno
PR
Italy
View
5.07 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Acea Viale San Rocco
1   5

Viale San Rocco 2/B
Colorno
PR
Italy
View
5.12 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Acea Coop
1   5

Piazzale 2 Giugno
Colorno
PR
Italy
View
5.15 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Acea Scuola dell'infanzia
1   5

Via Palmiro Togliatti 7/A
Colorno
PR
Italy
View
5.16 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Be Charge Torrile
1   5

Via di Vittorio 41
Torrile
PR
Italy
View
5.62 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Viale Vezzoni
2   8

Viale Vezzoni
Fontanellato
Emilia-Romagna
43012
Italy
View
6.12 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In

Uploaded by ForumElettrico.it on 2021-12-22

Uploaded by ForumElettrico.it on 2021-12-22

Uploaded by ForumElettrico.it on 2021-12-22

Uploaded by ForumElettrico.it on 2021-12-22

Uploaded by ForumElettrico.it on 2021-12-22