Enel X McDonald'scharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Il parcheggio è quello del McDonald's ma accanto c'è un altro ristorante e di fronte una pizzeria. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-20-kw-mcdonald-s-barberino-di-mugello-fi-via-del-lago-11-t22423.html
https://www.forumelettrico.it/forum/colonnina-enel-x-20-kw-mcdonald-s-barberino-di-mugello-fi-via-del-lago-11-t22423.html Comment by ForumElettrico.it 12/28/2021 18:29:36
Other Charging Locations
There are 9 matching results
Enel X Way Casello di Barberino di Mugello
9
13
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Casello di Barberino di Mugello
2
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Barberino Designer Outlet
3
8
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Supercharger Barberino Del Mugello
1
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
COOP Barberino di Mugello | ENELX
1
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A1AdS Aglio Est verso Bologna
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Estra Municipio di Vaiano
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Estra Avis Vaianos
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Estra Via dei Cernitori Vaiano
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-12-28
Uploaded by ForumElettrico.it on 2021-12-28
Uploaded by ForumElettrico.it on 2021-12-28
Uploaded by ForumElettrico.it on 2021-12-28
Uploaded by ForumElettrico.it on 2021-12-28