To edit, add comments or upload photos: Sign In
Franceschetto Autocharging location
Nearest Address:
Via Viola 3
Molinella
Bologna
40062
Italy
051 881479
+39 339 506 6653
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Private - For Staff, Visitors or Customers
Operational Status:
Operational
Latitude:
44.61998536511919
Longitude:
11.664699389660655
OCM Ref: OCM-191058
Access Information:
Libero accesso
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-309946
7.4 kW
AC (Single-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Via Giacomo Leopardi Santa Maria Codifiume
3.15 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Viale Rimembranze Consandolo
1
5.99 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Municipio
1
5
6.66 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Via Europa
6.8 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Via Centrale
7.76 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
San Bartolomeo in Bosco
7.88 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via della Confraternità dei Battuti Bianchi
8.26 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Via Fanno 1
8.51 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Powy Coop
1
5
8.54 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In