Ewiva Multiplex Super 8 Campiglionecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Ewiva (IT) https://ewiva.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]4 connettori CCS Combo 2 da 150 kW, in attesa di attivazione. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/hpc-enelx-a-campiglione-di-fermo-t20459.html
https://www.forumelettrico.it/forum/hpc-enelx-a-campiglione-di-fermo-t20459.html Comment by ForumElettrico.it 01/18/2022 15:41:50
Other Charging Locations
There are 9 matching results
EnelX CC Il Girasole
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Chiesa San Gabriele dell'Addolorata † | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fermo Tornabuoni | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parcheggio Via Beni - Ospedale di Fermo
1
(Unknown)
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fermo Bocciofila | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repower Fermo Piazza Dante
1
1
(Unknown)
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fermo Parcheggio Cimitero Contrada Mossa | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fermo Pompeiana | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fermo Giammarco | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-01-18
Uploaded by ForumElettrico.it on 2022-01-18
Uploaded by ForumElettrico.it on 2022-01-18