Be Charge Roadhousecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Di fronte abbiamo un ristorante e dall'altra parte troviamo un altro bar con anche cucina. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-roadhouse-parma-pr-viale-delle-esposizioni-3-t22929.html
https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-roadhouse-parma-pr-viale-delle-esposizioni-3-t22929.html Comment by ForumElettrico.it 01/20/2022 14:58:26
Other Charging Locations
There are 9 matching results
EnerMia Roadhouse
3
11
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Volkswagen Autocentro Baistrocchi
1
4
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Audi Autocentro Baistrocchi
1
4
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnerMia
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Centro Torri
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Supercharger Parma - disponibile per veicoli non Tesla
1
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Euro Torri
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Euro Torri San Leonardo
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
AG Hotel e-Station
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-01-20
Uploaded by ForumElettrico.it on 2022-01-20
Uploaded by ForumElettrico.it on 2022-01-20
Uploaded by ForumElettrico.it on 2022-01-20
Uploaded by ForumElettrico.it on 2022-01-20