Enel X Lippocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nel parcheggio vi è l'obbligo di disco orario con limite massimo di due ore, eccetto autorizzati... ma noi saremo autorizzati se stiamo ricaricando? Boh! Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-calderara-di-reno-bo-via-crocetta-52-lippo-t23520.html
https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-calderara-di-reno-bo-via-crocetta-52-lippo-t23520.html Comment by ForumElettrico.it 02/19/2022 10:50:07
Other Charging Locations
There are 9 matching results
Be Charge Lippo
1
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aeroporto G. Marconi
Public
Operational
Level 2 : Medium (Over 2kW)
Unknown
ParkinGO BOLOGNA
1
1
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Giardino Sarah Jay | EnelX
1
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge ALDI
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Polisportiva Lame
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Marco Polo
1
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Stazione Bologna Borgo Panigale | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Bargellino
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-02-22
Uploaded by ForumElettrico.it on 2022-02-22
Uploaded by ForumElettrico.it on 2022-02-22
Uploaded by ForumElettrico.it on 2022-02-22
Uploaded by ForumElettrico.it on 2022-02-22