Be Charge Enicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Anche se siamo nella periferia di Milano c'è tutto in zona: bar, supermercati, fast food, hotel, vari negozi ed uffici. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/fast-be-charge-presso-eni-via-gallarate-40-milano-t22507.html
https://www.forumelettrico.it/forum/fast-be-charge-presso-eni-via-gallarate-40-milano-t22507.html Comment by ForumElettrico.it 06/03/2022 13:33:36
Other Charging Locations
There are 9 matching results
zephyro MI
(Unknown)
Unknown
EnelX EVA+ ADS Q8 MILANO De Gasperi
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Iper Portello
2
10
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Peugot Automobil Italia S.p.a.
Operational
Level 3: High (Over 40kW)
CHAdeMO
MediaWorld Certosa
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A Q8 Easy
2
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Portello Fiera park
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Sorgenia sede
3
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Quarto Oggiaro
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-06-03
Uploaded by ForumElettrico.it on 2022-06-03
Uploaded by ForumElettrico.it on 2022-06-03
Uploaded by ForumElettrico.it on 2022-06-03