Be Charge Municipiocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Accanto abbiamo un bar ed a 5 minuti a piedi verso nord-ovest troviamo un altro bar pizzeria ed un ristorante. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-municipio-di-valle-castellana-te-sp-49-t25916.html
https://www.forumelettrico.it/forum/colonnine-be-charge-22-kw-municipio-di-valle-castellana-te-sp-49-t25916.html Comment by ForumElettrico.it 06/30/2022 06:19:45
Other Charging Locations
There are 9 matching results
EnelX Punto Enel di Ascoli Piceno
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ascoli Piceno Piazza Roma | EnelX
1
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ascoli Vellei | EnelX
1
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Genera Scarl
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Becharge - Viale della Repubblica
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Piano della lenta
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Villa Pigna
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Conad
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Largo degli aranci
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-06-30
Uploaded by ForumElettrico.it on 2022-06-30
Uploaded by ForumElettrico.it on 2022-06-30
Uploaded by ForumElettrico.it on 2022-06-30
Uploaded by ForumElettrico.it on 2022-06-30