Be Charge Pasubio charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Appena fuori dalla circonvallazione di Bologna verso ovest con diversi bar, ristoranti ed esercizi commerciali di ogni tipo nelle vicinanze. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-bologna-bo-via-montello-29-t26226.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-bologna-bo-via-montello-29-t26226.html Comment by ForumElettrico.it 07/16/2022 09:12:23
Other Charging Locations
There are 9 matching results
Via XXI aprile 1945
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
BOLOGNA Cimabue | ENELX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BOLOGNA Baracca BECHARGE
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BOLOGNA Berti BeCharge
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Stadio Renato Dall'Ara
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Foscolo
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cimitero Monumentale di Bologna | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Irma Bandiera | HERA
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-07-16
Uploaded by ForumElettrico.it on 2022-07-16
Uploaded by ForumElettrico.it on 2022-07-16
Uploaded by ForumElettrico.it on 2022-07-16
Uploaded by ForumElettrico.it on 2022-07-16