Arundell Arms Hotel and Restaurantcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Zero Carbon World http://zerocarbonworld.org/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
BS1363 3 Pin 13 Amp
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]32A socket had no power, 13A working, should be enough for a top up for now.
Comment by Simon Hewison 03/28/2016 18:29:47
Rating: 4 out of 5 [ General Comment , Charged Successfully ]Just off the A30, a 32amp and 16amp Rolec charge points located at the rear of the car park. Friendly staff and a lovely menu!!
Comment by Darrell Watts 08/31/2014 06:55:14
Other Charging Locations
There are 9 matching results
Arundell Arms Hotel
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Lifton Supercharger
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Strawberry Fields Farm Shop
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Netherbridge Lakes Holiday Barns
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Race Hill
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Great Bidlake Manor
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
West Devon Borough Council
Private - For Staff, Visitors or Customers
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Well Farm Cottages
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
zest-date-owed-dust
Public
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)