Neogy Shellcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Neogy https://www.neogy.it/ 800 832 855
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema con app Recharge Around di Repower sulla CCS Combo 2 di sinistra ed ho interrotto avvicinandomi all'auto e premendo il pulsante sulla presa auto. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post456246.html#p456246
https://www.forumelettrico.it/forum/post456246.html#p456246 Comment by ForumElettrico.it 08/16/2024 14:17:30
[ General Comment , Charged Successfully ]Ottima per chi deve caricare in viaggio essendo, a poche centinaia di metri dall'uscita Bolzano Sud. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-fast-alperia-neogy-100kw-via-keplero-bolzano-agip-t26991.html
https://www.forumelettrico.it/forum/colonnina-fast-alperia-neogy-100kw-via-keplero-bolzano-agip-t26991.html Comment by ForumElettrico.it 05/29/2023 14:17:40
Other Charging Locations
There are 9 matching results
Hotel Four Points By Sheraton Bolzano
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Parcheggi interni FieraMesse BolzanoBozen | NEOGY
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fiera di Bolzano | Neogy
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
FAST FieraMesse BolzanoBozen | NEOGY
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
evway Fiera Bolzano - Messe Bozen
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Neogy Fiera di Bolzano
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Via Enrico Fermi - Enrico-Fermi-Straße 4
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Autoindustriale | Neogy
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Palaonda Bolzano | Neogy
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-08-16
Uploaded by ForumElettrico.it on 2024-08-16
Uploaded by ForumElettrico.it on 2024-08-16
Uploaded by ForumElettrico.it on 2024-08-16
Uploaded by ForumElettrico.it on 2024-08-16
Uploaded by ForumElettrico.it on 2023-05-29
Uploaded by ForumElettrico.it on 2023-05-29