Be Charge Enicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nella stazione di servizio c'è il classico bar Eni Cafè, ma siamo anche a soli 500 metri dal porto e tutto intorno troviamo servizi di ogni tipo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-eni-la-spezia-sp-viale-italia-160-t32292.html
https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-eni-la-spezia-sp-viale-italia-160-t32292.html Comment by ForumElettrico.it 06/28/2023 05:29:14
Other Charging Locations
There are 9 matching results
Enel X Palasport
2
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Atlante Le Terrazze
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Le Terrazze
2
4
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Eurospin La Spezia | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Duferco Enercoop
3
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Enel X Via Liguria
1
5
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Europa Park
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Montepertico
Public - Membership Required
Operational
Ewiva Porto Lotti
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-06-28
Uploaded by ForumElettrico.it on 2023-06-28
Uploaded by ForumElettrico.it on 2023-06-28
Uploaded by ForumElettrico.it on 2023-06-28