To edit, add comments or upload photos: Sign In
AUBERGENVILLE - Place François Mitterrandcharging location
Nearest Address:
Place François Mitterrand - 78410 AUBERGENVILLE
France
General Information:
Recharge par badge et avec une application smartphone
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Usage:
Public - Pay At Location
Operational Status:
Operational
Latitude:
48.971633911
Longitude:
1.848320007
OCM Ref: OCM-195787
Data Provider:
data.gouv.fr https://www.data.gouv.fr/fr/datasets/fichier-consolide-des-bornes-de-recharge-pour-vehicules-electriques/
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
Open License: https://www.etalab.gouv.fr/wp-content/uploads/2014/05/Licence_Ouverte.pdf
Providers Ref:
YBnJoZ3EaG
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
OCM-CN-326168
22 kW
AC (Three-Phase)
Type 2 (Tethered Connector)
Operational
OCM-CN-326169
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
FR*QOV*78-00003
0.31 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Electra - Aubergenville - CC Family Village
0.73 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Carrefour Energies - Flins-sur-Seine
0.82 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Atlante - Flins-sur-Seine - Del Arte
0.88 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
AUBERGENVILLE - Avenue De La Division Leclerc
0.98 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
FLINS-SUR-SEINE - Place Charles De Gaulle
1.11 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
FLINS-SUR-SEINE - Rue Maurice Berteaux
1.18 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
JUZIERS - Impasse Des Tennis
1.39 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
TotalEnergies - Relais de la Mauldre
1.77 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In