LY712 - GERLANDcharging location
Conditions accès aux bornes dépendantes des accords et formules de votre EMSP
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Izivia (Sodetrel) https://www.izivia.com/le-reseau-izivia
data.gouv.fr https://www.data.gouv.fr/fr/datasets/fichier-consolide-des-bornes-de-recharge-pour-vehicules-electriques/
Open License: https://www.etalab.gouv.fr/wp-content/uploads/2014/05/Licence_Ouverte.pdf
FRGLYPLYON16411
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CEE 7/4 - Schuko - Type F
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Norauto Gerland
(Unknown)
Operational
CNR Port de Lyon Edouard Herriot
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Socket Only)
LY707 - DEBOURG
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LY703 - HALLE TONY GARNIER
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Parking Tony Garnier
(Unknown)
Operational
Bump - Super U - Lyon Gerland
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LY702 - JEAN JAURES
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PowerDot - Hôtel F1 - Oullins
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
OUL03 - GARE DOULLINS
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In