VIL02 - TETE DOR - STALINGRADcharging location
Conditions accès aux bornes dépendantes des accords et formules de votre EMSP
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Izivia (Sodetrel) https://www.izivia.com/le-reseau-izivia
data.gouv.fr https://www.data.gouv.fr/fr/datasets/fichier-consolide-des-bornes-de-recharge-pour-vehicules-electriques/
Open License: https://www.etalab.gouv.fr/wp-content/uploads/2014/05/Licence_Ouverte.pdf
FRGLYPLYON6211
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
VIL16 - CHAPLIN - STALINGRAD
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
VIL06 - WILSON - TONKIN
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Parking Cité Internationale
Public
Unknown
LY607 - MONTGOLFIER
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Mercure - Villeurbanne Charpennes
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
VIL03 - LA DOUA
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
CAL06 - SAINT CLAIR
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
LY606 - BOILEAU - MONTGOLFIER
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
LY603 - BROTTEAUX
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In