To edit, add comments or upload photos: Sign In
Toulon Sur Allier, Centre Routier - ZI Les Grischarging location
Nearest Address:
Centre Routier - ZI Les Gris 03400 Toulon Sur Allier
France
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Usage:
Public - Pay At Location
Operational Status:
Operational
Latitude:
46.50575147
Longitude:
3.36105943
OCM Ref: OCM-197502
Data Provider:
data.gouv.fr https://www.data.gouv.fr/fr/datasets/fichier-consolide-des-bornes-de-recharge-pour-vehicules-electriques/
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
Open License: https://www.etalab.gouv.fr/wp-content/uploads/2014/05/Licence_Ouverte.pdf
Providers Ref:
FR*EBN*PCENTREROUTIER
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
OCM-CN-329236
50 kW
AC (Three-Phase)
CHAdeMO
Operational
OCM-CN-329237
50 kW
DC
CCS (Type 2)
Operational
OCM-CN-329238
50 kW
DC
Type 2 (Tethered Connector)
Operational
OCM-CN-329239
50 kW
AC (Three-Phase)
CHAdeMO
Operational
OCM-CN-329240
50 kW
DC
CCS (Type 2)
Operational
OCM-CN-329241
50 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Tesla Supercharger Aire du Bourbonnais
A79 - Aire du Bourbonnais
Domaine de Sannes
Toulon-sur-Allier
Auvergne-Rhône-Alpes
03400
France
View
0.56 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ionity Aire du Bourbonnais
0.58 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Carrefour Energies - Moulins
2.54 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Allego - Burger King Moulins Yzeure
2.68 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra - Moulins - KFC
2.81 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Yzeure, Rond-Point Liberté
3.3 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Moulins, Avenue de la République
4.11 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Yzeure, Place Bendorf
4.13 Miles
Public
Operational
Level 3: High (Over 40kW)
Unknown
Public
Operational
Level 3: High (Over 40kW)
Unknown
Moulins, Rue Achille Roche
4.16 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In