To edit, add comments or upload photos: Sign In
Parking personnel du Hyper Ucharging location
Nearest Address:
Pont d'Aspach
France
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Usage:
Public - Pay At Location
Operational Status:
Operational
Latitude:
47.740717
Longitude:
7.149815
OCM Ref: OCM-197684
Data Provider:
data.gouv.fr https://www.data.gouv.fr/fr/datasets/fichier-consolide-des-bornes-de-recharge-pour-vehicules-electriques/
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
Open License: https://www.etalab.gouv.fr/wp-content/uploads/2014/05/Licence_Ouverte.pdf
Providers Ref:
FR*ZMS*418832*X
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
OCM-CN-329528
7 kW
AC (Single-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ionity Burnhaupt
0.11 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
TotalEnergies - Relais de Porte d'Alsace Nord
A36 - Aire de la Porte d'Alsace Nord
Burnhaupt-le-Bas
Alsace–Champagne-Ardenne–Lorraine
68520
France
View
1.77 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
TotalEnergies - Relais de Porte d’Alsace Sud
1.78 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PowerDot - Centre Commercial - Cernay
3.76 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PowerDot - Supermarché Match - Thann
5.09 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra - Morschwiller-le-Bas - KFC
6.34 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PowerDot - Carrefour - Mulhouse-Dornach
6.68 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra - Lutterbach - Hôtel Kyriad
6.75 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
50 RUE MARC SEGUIN 68200 MULHOUSE
6.79 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Upload your own photos for this location: Sign In