To edit, add comments or upload photos: Sign In
Metropolis - Citadine - Villepinte - Norbert Segardcharging location
Nearest Address:
Rue Norbert Segard 93420 VILLEPINTE
France
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Usage:
Public
Operational Status:
Operational
Latitude:
48.956136
Longitude:
2.539899
OCM Ref: OCM-199192
Data Provider:
data.gouv.fr https://www.data.gouv.fr/fr/datasets/fichier-consolide-des-bornes-de-recharge-pour-vehicules-electriques/
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
Open License: https://www.etalab.gouv.fr/wp-content/uploads/2014/05/Licence_Ouverte.pdf
Providers Ref:
FRMGPP93078C
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
OCM-CN-332436
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Metropolis - Citadine - Villepinte - Hôtel de Ville
0.56 Miles
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Carrefour Energies - Sevran
0.7 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra - Villepinte - Hôtel Campanile
0.72 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Metropolis - Citadine - Sevran - Dumont d'Urville
1.03 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Metropolis - Villepinte - Rêve
1.04 Miles
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Inter Hotel Acadie Tremblay en France
1.19 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
TotalEnergies - Relais Tremblay-en-France
1.23 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra - Villepinte - Hôtel Ibis
1.25 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Metropolis - Sevran - Roger le Maner
1.29 Miles
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In