Villargordo del Cabriel - (Iberdrola)charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Iberdrola | BP Pulse (ES) https://www.iberdrola.es/clientes/hogar/movilidad-verde/recarga 900 22 45 22
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
The DC charger allows charging one vehicle at 320kW, or two simultaneous charges at 160kW. Boosted with a 160 kWh battery. Charging power limited for 400V cars. Power limited to 50kW when charger battery is low of charge
CCS (Type 2)
Ingeteam Rapid50 charger
CHAdeMO
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Galp Villagordo del Cabriel (Dir. Madrid) (Zunder)
1
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Galp Villagordo del Cabriel (Dir. Valencia)
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bodegas Neleman
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Sertranin Pol Fuente de los Arrieros
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
REPSOL Caudete de las Fuentes
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Hotel Rural Entreviñas
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Bodegas Nodus
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Minglanilla (Acciona)
1
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Repsol Minglanilla
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)