To edit, add comments or upload photos: Sign In
E.S. Repsol Tébarcharging location
Nearest Address:
Área de Servicio El Picazo
Tébar
Castile-La Mancha
Spain
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
0,47€/kwh
Operational Status:
Not Operational
Latitude:
39.48410552895959
Longitude:
-2.1584121144344977
OCM Ref: OCM-201547
Network/Operator
Repsol - Ibil (ES) https://www.repsol.es/particulares/vehiculos/movilidad-electrica/ 902 540 810
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-336367
100 kW
DC
920 V
250 A
Circontrol Raption100 Charger
CHAdeMO
Operational
1 Present
OCM-CN-336368
50 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Atalaya del Cañavate Tesla Supercharger
1
6.36 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Atalaya de Cañavate (Iberdrola)
1
1
6.38 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Honrrubia. Rest. El Marino I (Zunder)
3
10.04 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest. El Marino I (Wenea)
4
10.09 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BP Moya Honrubia
1
10.44 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Restaurante Moya
3
10
10.45 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Repsol Ortiz Espin
11.15 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Villanueva de la Jara
1
11.65 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repsol Motilla de Palancar
1
14.17 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)