To edit, add comments or upload photos: Sign In
PowerDot - Team Square - Hénin-Beaumontcharging location
Nearest Address:
3 Chemin de Bois Bernard
Hénin-Beaumont
Nord-Pas-de-Calais and Picardy
62110
France
Number Of Stations/Bays:
2
Usage:
Public
Usage Cost:
Operational Status:
Operational
Latitude:
50.386941671623305
Longitude:
2.9651454652930624
OCM Ref: OCM-202081
Network/Operator
Power Dot https://powerdot.fr/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-337731
50 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-337732
50 kW
DC
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-337733
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
IKEA Henin-Beaumont
Centre Commercial Maison Plus
275 Boulevard Olof Palme
Hénin-Beaumont
Nord Pas de Calais
62110
France
View
0.66 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Moy_Park_1
1.13 Miles
Public
Operational
Level 3: High (Over 40kW)
Unknown
Public
Operational
Level 3: High (Over 40kW)
Unknown
PowerDot - Speed Park - Hénin-Beaumont
1.24 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PowerDot - Cinéville - Hénin-Beaumont
1.37 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LA FERME DE LA MOTTE
1.46 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Tesla Supercharger Noyelles-Godault
1.64 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Auchan NOYELLES GODAULT
1
1.89 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Electra - Noyelles-Godault - Hôtel Première Classe
1.99 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Citroën Noyelles-Godault
2.02 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In