Enel X Way Q8charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]4 CCS Combo 2 da 300 kW e due CHAdeMO, a poche centinaia di metri dall'Uscita Montecosaro della superstrada Foligno-Civitanova Marche. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-high-power-enel-x-q8-porsche-sant-elpidio-a-mare-fm-t22744.html
https://www.forumelettrico.it/forum/colonnine-high-power-enel-x-q8-porsche-sant-elpidio-a-mare-fm-t22744.html Comment by ForumElettrico.it 09/26/2022 05:31:48
Other Charging Locations
There are 9 matching results
Enel X Eni
1
2
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Iper La grande I c/o CC Il Cuore Adriatico
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ionity Civitanova Marche
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Sandwich Time
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LIDL Civitanova Marche
2
2
Public
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fast Autolavaggio - Via Fontanella
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Concessionaria Volvo - Via Martiri di Belfiore
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
DC Station MF
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Cosmopolitan Hotel
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-09-26