To edit, add comments or upload photos: Sign In
Ayunt. de Lora del Ríocharging location
Nearest Address:
Ayuntamiento de Lora del Río
Lora del Río
Andalusia
Spain
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public
Usage Cost:
Operational Status:
Operational
Latitude:
37.6589949973596
Longitude:
-5.526742103523702
OCM Ref: OCM-205139
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-342509
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Mercadona Lora del Río
0.02 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenoil Lora Del Río I
1
0.53 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Espalmex
2.93 Miles
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
E.S. Ruta 4
1
12.85 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Cortijo Santa Clara
13.38 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Recinto Ferial Palma del Río
13.47 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. de Palma del Río Teatro
1
13.61 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ITV Carmona
13.8 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. de Palma del Río
13.81 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In