Consum Pobla de Valbonacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Eranovum (ES) https://eranovum.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Power electronics NB120 Charger. The DC charger allows charging one vehicle at 120kW, or two simultaneous charges at 60kW
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ayunt. Pobla de Valbona: Avda. Mar Mediterráneo
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Pobla de Valbona: Avda. Principal
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. La Pobla de Vallbona: Centro Salud
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. La Pobla de Vallbona: Lepanto
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Pobla de Valbona: Plaza Mercado
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. La Pobla de Vallbona: Senyera
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mercadona Pobla de Valbona
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. La Pobla de Vallbona: Reyes Católicos
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Peugeot Benissanó
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)