Hera Chiesa della Madonna del Baraccanocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
HeraRicarica Pubblica https://heracomm.gruppohera.it/casa/mobilita-sostenibile/ricarica-pubblica 800.087.591
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Attraversando il parco accanto, partono poi dei lunghi portici su entrambi i lati con negozi e servizi di ogni tipo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-hera-12-kw-chiesa-della-madonna-del-baraccano-bologna-bo-piazza-del-baraccano-5-t28976.html
https://www.forumelettrico.it/forum/colonnina-hera-12-kw-chiesa-della-madonna-del-baraccano-bologna-bo-piazza-del-baraccano-5-t28976.html Comment by ForumElettrico.it 12/10/2022 16:35:25
Other Charging Locations
There are 9 matching results
Bologna Casa Carducci | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Giardini Margherita | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BOLOGNA Oriani | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Rubbiani
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Corte d'Appello
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Codivilla | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Istituto Ortopedico Rizzoli
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Pancaldi
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Colonnina Enermia 22kW
4
9
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-12-10
Uploaded by ForumElettrico.it on 2022-12-10
Uploaded by ForumElettrico.it on 2022-12-10
Uploaded by ForumElettrico.it on 2022-12-10
Uploaded by ForumElettrico.it on 2022-12-10