Tesla Mantova Outlet Village - disponibile per veicoli non Teslacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Tesla (including non-tesla) https://www.tesla.com/en_AU/support/non-tesla-supercharging
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment/Location Has Been Decommissioned ]16 stalli da 250 kW situati nel parcheggio dell'Outlet. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/supercharge-in-costruzione-mantova-village-bagnolo-san-vito-t27843.html
https://www.forumelettrico.it/forum/supercharge-in-costruzione-mantova-village-bagnolo-san-vito-t27843.html Comment by ForumElettrico.it 01/16/2023 06:32:52
Other Charging Locations
There are 9 matching results
Ewiva Mantova Outlet Village
3
8
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EVAD Mantova Outlet Village
7
14
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra Mantova Village
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ADS Sarni Po Ovest A22
5
16
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Best Western Hotel Cristallo
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
GasGas D'Annunzio
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
GasGas Coop
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
GasGas Municipio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Route220 Stadio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)