POWY HPC Euronicscharging location

Nearest Address:
Viale della Serenissima
Vicenza
Veneto
36040
Italy

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 2
Usage: Public - Membership Required
Operational Status: Operational
Latitude: 45.52639812898491
Longitude: 11.595834902390266
OCM Ref: OCM-211001
Network/Operator

POWY https://powy.energy/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 70 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - No comments or check-ins
  •   User Feedback - No photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

CCS (Type 2)

Operational
2 Present
OCM-CN-351737
100 kW DC

Add your own comment/check-in for this location:

Sign In

Other Charging Locations

There are 9 matching results

Ekomobil - 22 Kw
 

Ekomobil - 22 Kw
Via della Serenissima 6
Vicenza
VI
36100
Italy
View
0.06 Miles
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

EVAD Pantano Ricambi
4   7

Via Ludovico Lazzaro Zamenhof, 54
Vicenza
VI
36100
Italy
View
0.44 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Eneldrive Industria
 

Via Industria, 8
Torri di Quartesolo
VI
36040
Italy
View
0.58 Miles
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Enel X Way Leroy Merlin
1   6

Via Brescia
Torri di Quartesolo
Veneto
36020
Italy
View
1.72 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

LIDL Vicenza Bortolan
1   1

Via Domenico Bortolan
San Pio X
Vicenza
VI
36100
Italy
View
1.75 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

RI.CARICA - LE PIRAMIDI
 

Via Brescia
Torri di Quartesolo
Veneto
36020
Italy
View
1.9 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Vicenza Supercharger anche per veicoli non Tesla
 

20 Via Brescia
Vicenza
36040
Italy
View
1.92 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Ewiva Torri di Quartesolo
1  

Via Pola
Torri di Quartesolo
Veneto
36020
Italy
View
2.02 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

CHARGEPOINT ads Tesina Sud direzione Venezia
 

A4, Autostrada Serenissima
Torri di Quartesolo
Veneto
36040
Italy
View
2.06 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Upload your own photos for this location: Sign In