Ewiva Coop Aronacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Ewiva (IT) https://ewiva.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Una sola CCS Combo 2 da 100 kW, situata nel settore B06 e con accesso unico da via Corleone 15. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-high-power-enel-x-coop-milano-procida-mi-t22714-10.html
https://www.forumelettrico.it/forum/colonnina-high-power-enel-x-coop-milano-procida-mi-t22714-10.html Comment by ForumElettrico.it 02/01/2023 06:55:35
Other Charging Locations
There are 9 matching results
BECHARGE Milano Salvioni
1
9
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Una Hotel Scandinavia
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Enterprise Hotel
Private - For Staff, Visitors or Customers
Unknown
AUTORIMESSA SEMPIONE 76
Public - Pay At Location
Operational
Enterprise Hotel, Design Hotel & Congress Centre
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
A2A Fiera Est
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A Traiano
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Green Park
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Portello Fiera park
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-02-01
Uploaded by ForumElettrico.it on 2023-02-01
Uploaded by ForumElettrico.it on 2023-02-01