Gilbert Public Safety Training Facilitycharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily TEMPORARILY UNAVAILABLE (Public - Credit card at all times)
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
212786
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
The Maxwell at Cooley Station - 1
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The Maxwell at Cooley Station - 5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The Maxwell at Cooley Station - 3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
TEDS RANGE TEDS RANGE 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The Maxwell at Cooley Station - 4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
EV2018 POLY LOT 48
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
EV2018 POLY LOT 5
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
EV2018 POLY LOT 49
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Icon at Cooley Station
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In