UCO STATION 2charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
ChargePoint http://www.chargepoint.net/ 1-408-841-4500
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
221966
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
University of Central Oklahoma - Parking Lot 57
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
University of Central Oklahoma - Nigh University Center
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
City First Building
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
UCO STATION 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
University of Central Oklahoma - Parking Lot 16
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
EDMONDOK DOWNTOWN
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
EDMONDOK RAILYARD
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
EDMONDOK FESTIVAL MARKET
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
EDMONDOK 5TH STREET
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In